Answer Posted / asish
ACB means air circuit breaker, it can be used in on load
condition,i.e both normal and fault condition due to its arc
quenching method where as in case of isolator, it is used as
a off load switch.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Please, if 1kw is equal to 1.25kva; how then do I know how many kva in 7.5kw?
is all the servo motors having brake?please specify which servo motors having brake for stop on position and which are not.
What is the difference b/w fanuc alpha series 16i and 18i controller. what is stand for i
Define delay time.
What is the effect on 3phase induction motor if current setting knob of DOL kept at minimum current?
i have 90kw motor.so i choose connect cable .please what is parameter checked so please give to formula
If we are given a 10 amp cable type and asked to calculate the number of cores used and the thickness of the cable, how do we do it?? please help...urgent!! i hope the question is clear enough!!
what is difference between bus coupler and auto transfer switch
How i can calculate current of cable according to ares?
What is a difference between indoor transformer and outdoor transformer of same rating
The gauge indicates the number of amps, but what about voltage? How voltage rating (for wire or fuse) determined?
what is the eight bit unit?
What are the functions of temperature scanner in power transformer?
what is the relation between size of the anteena and wavelenghth of radiated wave
TRAFO 1. WHY BREATHER IS USED. 2. WHY OIL GOES DOWN IN CONSERVATOR TANK. 3. WHY WE ARE TAKING OIL SAMPLE TAKING FROM BOTTOM OF TRANSFORMER. 4. HOW TO CHECK IR VALUE OF TRANSFORMER. 5. WHY OLTC HAVING BUCHHOLZ TRIP ONLY; WHY NO ALARM. 6. OFF LOAD TAP CHANGER OPERATION PROCEDURE. 7. TR. SHUTDOWN / ISOLATION PROCEDURE. 8. WHEN THREE TRS. IN PARALLEL, ONE TR. IS NOT SHARING THE LOAD – WHAT IS REASON AND WHAT YOU WILL DO. 9. WHY TR. HAS OLTC IN HV SIDE. 10. WHAT IS % IMPEDANCE. 11. WHY TR. RATING IN MVA. 12. WHAT IS VECTOR GROUP IN TR. 13. CONDITION FOR PARALLEL OPERATION OF TRS. 14. WHAT IS TERTIARY WINDING. WHERE IT WILL BE. 15. IF TR. TRIP ON BUCHHOLZ OR TAP CHANGER RELAY, WHAT YOU WILL DO. 16. DIFFERENCE BETWEEN OIL TEMP. AND WINDING TEMP. PROTECTION 17. HOW WINDING TEMP. IS MEASURED IN CAST RESIN TR. 18. DIFFERENT TYPES OF FAULTS IN TR. Trafo - Page-1 of 2 19. WHAT HAPPENS WHEN TR. CHARGED FROM LV. 20. WHAT WILL YOU DO IF MEGGER READING SHOWS ZERO BETWEEN LV WINDING AND EARTH. 21. CAN WE INTERCHANGE BUCHHOLZ RELAY OF MAIN TANK AND OLTC TANK. 22. IF THE LINE BETWEEN BREATHER AND CONSERVATOR TANK 23. LOCKED, WHAT WILL HAPPEN DURING LOAD CYCLE. 24. WHAT IS THE FUNCTION OF OIL SEAL IN BREATHER. 25. WHAT ARE LOCATIONS FOR BUCHHOLZ RELAY FIXED IN POWER TR. 26. WHAT ARE CHECKS IN POWER TR. DURING MAINTENANCE. 27. WHAT IS IMPORTANT WHEN WE CHECK OLTC OPERATION DURING MAINTENANCE. Trafo - Page 2 of 2