Answer Posted / k.amirthalingam
Formwork is the temporary wooden works or steel works which
will hold the concrete when it is freshly poured. The
formwork material will be of plywood,steel sheet, normal
18mm thick wood. We say in Civil engineering as Shuttering
works.
By
Amirthalingam
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
What is geopolymer based concrete?
what is a well
what are the values of compressieve strenght?
What is the primary difference between adsorption and absorption?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
how to prepare site mix design
What is the density of DLC & PQC and how it is differ from normal concrete?
What is thumb rule in quality and quantity estimation of a Residential building??
Minimum and maximum size of the building components
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
how statics is different from dynamics
How can you distinguish between sorption, absorption and adsorption?
115mm thickness brick work how to required mortar
How many lbs are there in a yard?