Answer Posted / k.amirthalingam
Formwork is the temporary wooden works or steel works which
will hold the concrete when it is freshly poured. The
formwork material will be of plywood,steel sheet, normal
18mm thick wood. We say in Civil engineering as Shuttering
works.
By
Amirthalingam
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
What is the strength of 1:6:12 mix?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
How cracks in concrete can be avoided?
How is make concrete cube?
What do you mean by tolerance factor of concrete ?
what is right & short method of measurement of slab&beam
How do you compute volume of airflow?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
How and where are aqueducts built?
what is the calculation of raw material for 0.35cum of m-15
Which architectural movement is also known as jazz moderna?