How supply comes to your home?

Answer Posted / umesh

IN GENERATING POWER STATION 33KV IS PRODUCING. THAT 33KV IS
STEP UP TO 220KV AND TRANSMITTED TO SUBSTATION AS 66KV OR 33KV
. FROM THE SUBSTATION 33KV IS SEND AS 230V TO RECEIVING
STATION . FROM RECEIVING STATION TO YOUR HOUSE.

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Types of test in Switchgears, MCC, NGR and DB's how it should be procced. Can anyone give me the details here or email me to pasuvaraj.k@gmail.com

1617


In Power cable specification what is U0/U and Um.

3209


Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?

1471


how to compare with Relay settings for HT< panels, RMU panel, and PSS CSS transformer?? 1) Load amps, 2)Tripping time, 3) CT ratio, 4)Cable size 5) Transformer KVA rating 6) transformer full load amps

721


What is fault clearing time for Current Limiting Moulded Case Circuit Breaker?.

1319






What is stepper motor?

720


sir i am apearing for nic exam.i dont know exam pattern.can you please send me some model papers

1496


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

693


I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.

1920


Diagram and details of polarity test for Current Transformer 11kv 400/200/100/1A

2560


Advantages of using generator circuit breaker (GCB) scheme in a power station ?

4735


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7008


sir pls send the je exam - 2008 and other model question papers..

1654


What is negative sequence over voltage element?

1418


PLEASE ANYBODY HAVE ELECTRICAL CIRCUIT DIAGRAM FOR CHMER PULSE CD 60M SPARKING MACHINE.PLEASE MAIL ME SUPRIYAAYYAPPAN@YAHOO.CO.IN.

2342