Answer Posted / mannemahesh
m refers for mix and 45 refers concrete strength in 28 days
| Is This Answer Correct ? | 18 Yes | 0 No |
Post New Answer View All Answers
How many cum of 9.5mm stone in 1 ton ?
Why are steel plates inserted inside bearings in elastomeric bearings?
Explain what is progress payment?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
how many cement used in single story residential building per sqft
What tor stands for in tor steel?
what is constat for brickwork
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
what is the dimensions of river sand truck trailer or trolly ?
Why the finite element method is lower bound solution?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
what"s the sort of beams?
What you understand by building codes?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr