what will happen at the time of CT saturation?and what will
be the Relay's function at the time of CT saturation?
Answer Posted / k.prakashchandra
After saturation point the secondary current will not
increase with the primary current and hence measurement
will not be accurate.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
I'm generating a pulse of 3V with frequency 80Hz (12.5ms time period) and pulse duration 0.125ms and feeding it to a transformer since i want the pulse to get amplified around 60V. At the output amplification s happening but the pulse is changed to a spike, can you tell me what could be the reason? (an ordinary transformer 220V-12V stepdown transformer is reverse connected ie. now it is 12V-220V stepup and voltage amplification happens)
3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.
Atwhat condition reverse power relay will act?
how to calculate units consumption for a 12 hp motor /hr.
How many types of losses occur in a transformer?
if 2 coil of 1000W connect in series and 200 v is applied across it . then what is the total power of coil when coil have only resistive load .
How to calculate the sag of OPGW during stringing???
What is the simplest formula to calculate the rotor diameter of a synchronous generator?
description with working of all parts of a Diesel generator???????
what is the difference between single ratio, multiple core and multiple ratio, multiple core ? please explain.
What is the difference between diesel generator engine with and without turbo charger with the same capacity?
After completing iti in electrician, how can i get certificate of electrical supervisor? What ia requirements. For it?
what are the principles of a booster converter?
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
Types of test in Switchgears, MCC, NGR and DB's how it should be procced. Can anyone give me the details here or email me to pasuvaraj.k@gmail.com