Answer Posted / mallikarjun b
when the amount of concrete is much lesser than the required amount it is called lean concrete
Is This Answer Correct ? | 5 Yes | 20 No |
Post New Answer View All Answers
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
Name the main components of a cad gui?
What is meant by dimensioning?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
what r the precaution for high in atp tempareture,low in atp tempareture
How to fix toll charge for a particular vehicle at toll booths in a highway?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
why the openings of sieves are square io size?
What do you mean by the word 'shear'?
how much repeitation for conventional and maivan formwork?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
How you can use different dimension tools in cad? What are the different dimensions available?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
What is OSHA compliance?