Answer Posted / narendra
1 cement
5 sand
10 Aggregade
Is This Answer Correct ? | 23 Yes | 1 No |
Post New Answer View All Answers
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
IS code for Rolling Margin of steel
What is the different type of slump test indications?
How do you calculate the power of a centrifugal pump?
mix design procedure for 1:6 cement mortar
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
what is the use of beam end forces while using a staad ? wha they are show
how to calculate total cost for slab 35'×8'
what is shuttering co efficient?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
how pumping of concrete effects the quantity of material used in it?
in plate load test what is the thickness of plate 20mm 5mm 50mm none