Answer Posted / ketan_k
1.cost saving
2. additiaon of fine prticle in concrete ,
3. to reduse heat of hydration
4. prolongation of setting time of concrete
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
Define What is an ice dam sock?
what is tension footing?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
how to design and calculate materail quantity for concrete speedbreaker ?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
What does a construction cost covers and what does not?
How to make tiles floor step by step procedure?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
What should be the standard roof height like to be?
construction workers how much time take one work or qty
Which Types Of Bricks ?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Which are the Steel tests ?
what is total volume of ingredients used in concrete accordingly
what are the changes in concrete pour height as per IS 456, 2009?