What is vector group? What is meant by DYN11?Why is it needed?
Answer Posted / t eswara rao
Clarification for shraddha:
11o clock means primari voltage vectors leading 30deg
with reference to secondary voltage vectors.OR secondary
voltage vectors lagging 30deg with reference to primary
voltage vectors.
As in a clock at 11o clock big needle leads small
needle by 30deg OR small needle lags big needle by 30deg
| Is This Answer Correct ? | 5 Yes | 12 No |
Post New Answer View All Answers
how to select rating of HT Panel
how to design the heater in temperature control unit to heat 50KL of water?
can we use engine degreaser for electrical motors?
How can I calculate per unit (KWH) fuel (Gas/ Diesel both) consumption 1MW unit?
How to test IR testing & magnetic balance test
how to calculation increase capacitor,increase power factor for three phase.
in 1-phase 230v,how in 3-phase 440v. in each phase in between 230v.
hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.
Why does the rotor rotate?
how flow current in 220 kv line to line
For some transformers we are using solid neutral earthing while some others we are using resistance earthing why ?
how does the rotating m.m.f is produced in the 3-phase induction motor and how the poles are created in 3-phase induction motor ?
Why space heater is required for each verical bus bar chamber? if one space heater is adequate or not for anti condensation?
1. Design a counter which counts 0, 4, 8, 2, 6, and repeats using: 1.a using JK flip flops 1.b using T flip flops 1.c using D flip flops
How to Calculate the Fault Level of Electrical Installation