Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is vector group? What is meant by DYN11?Why is it needed?

Answer Posted / avnish

above answers are correct but as u asked shraddha that will
hv lead or lv so i clear that capital D is for secondary and
small forthe primary and again 11 ....means that hv have the
30 degree leading phase diffrence..

Is This Answer Correct ?    2 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how is control wiring coding is done in a CRP panel ?

1964


EXPLAIN THE TRANSFORMER MAINTENANCE?

2207


What are locations arc protection relay is fixed.

1810


what causes contact chatter when there is no demand on the air conditioning unit?

1986


why does connected a indutor with mnsformeretering core of current transformer ?

2093


What are factors to be considered while we selecting the Core Balance Current Transformer for Earth fault protection

1825


when ac current flows thru d coil of a contactr,it energizes,magnetic field attracts d contact of the coil...nw wont dt ac current in d contct induce current back on to d coil thru mutual inductance leading to high currnt in d coil

1662


Why we are using only Dyn11 tranformer in distribution system but not using a Dyn1 in distributing system?why not and advantage and disadvantage in both

2675


description with working of all parts of a Diesel generator???????

2395


where rlc series ckt used?

2156


If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables

1396


How Can you do Maintenance of ACB of 2000Amperes

2011


What is the complete procedure of erection of electrical panel in industry

1814


what will be project cost for 100 kv transformer connection under oyt scheme.

2878


While testing a ZCT what parameters have to check or measure?

2334