What is mean by sink and source in term of PLC and
drives,where and how they used in logic
Answer Posted / rahul
*Sink means the equipment need external supply.
*Source means equipment generate its self.
In term of PLC all inputs are sink and all outputs are source.
In terms of drive the control unit which need external supply for operation thats are sink type and the control unit which generate supply for controlling thats are source type.
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
what is meant by vector group of a transformer? How can it be derived?
Which thing is maximum in RLC circuit at resonance a)power consumption b)inductive current c)capacitive voltage
To prove the capacity of a 10MVA transforemr with 6.5% impedance by a short circuit test how much power is needed to inject an impedance voltage if we have to arrive for its rated current?
what is the efficiency of thyristor
How to findout raw or ups power? its not indicated in socket,
Give idea about General Engineering. From which book i can study this topic. Pl. reply me via email. My email is ravi@bhelhwr.co.in, also give the name of book/website, from where i can prepare it.
How many gap between finger contact in a.c.b. and v.cb.?
Explain about Dubai electrical sysaem? Explain about Dubai drinking water system? Explain about Dubai Burj tallest building Electrical,Water.etc.. maintenance system?
what is the working principle of energy saver control panel. please give the complete calculation & theory.
At what speed an electric car can run with 2 HP motor of weighing 400 kg?
What is the maximum number of swithes that can be connected in series up to down stream point in an LV Distribution system?
i have faced a problem in ro plant grunfos make bm30type pump it is 22kw pump. We start this pump using siemens 3rw 4423-ibc44, 30kw softstarter but this soft starter will frequently failier so we planed to change dol starter. So pls tell anybudy its possible or not.
What are the effects of adding a zero to a system?
what is the ckt diagram of a tubelight and is it the simplest ckt of electrical engineering and also the component?
What is the importance of counter based plan & how is it scheduled?