Answer Posted / mahij
TMT..BAR..
means a thermo mechanical process done on a steel bar..
| Is This Answer Correct ? | 31 Yes | 10 No |
Post New Answer View All Answers
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
How to calculate the force on a column of three story building. What should be the base concrete height?.
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
Define polar co ordinates.
How are freeway bridges built?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Explain the latest method to detect a crack in a building?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What type of tensile strength is handling by crank in beam? Thanks.
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
The 4 main factors to start a construction project are––
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience