Answer Posted / parthkumar salunke
up to plinth level it is called substructure and above
plinth level it is called superstructure.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is the force exerted by the tacoma narrows bridge?
what is idealized curve for concrere and steel
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
Did any of the egyptian pyramids ever fall down?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
psc girder detail
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
IS code for Rolling Margin of steel
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
how to calculate number of bitumen for road asphalt
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.