what are the duties of a production engineer in a power plant?
Answer Posted / kole
duties
1. To monitor and cordinate other crew on production floor
| Is This Answer Correct ? | 14 Yes | 3 No |
Post New Answer View All Answers
describe a type when u anticipated potential problems and development of preventive measure.
How do you determine what suction pressure should be in r22 air conditioning compressors suction line?
How does hydraulic clutches work?
One unit of btu is how many joules?
What is the difference between Muff Coupling and Screwed Coupling with Cotter pin used in pump line shafts.
sampile paper for dme in rrb exam
What are the different parts of impulse reaction turbine?
what is Direct control valve ? explain its practical applications?
Give five reasons why a reciprocating pump will reduce capacity or pressure when delivering water
What is the formula to determine the speed of induction motor?
meaning of 125kva DG
Please any one help me I preparing for the post of charge man in Indian ordinance factory please give me some guide line & book for this exam.my email. anoopkpandey16@gmail.com
Give me an introduction about myself.iam a engineering student, i would like to know, wat is my qualification till my enginering is not yet completed?
What are killed steels and what for these are used ?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb