Why the height of the bridges over the river are very low?

Answer Posted / m.haseeb yaquobi

to crass the water under that

Is This Answer Correct ?    1 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1028


If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

1910


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

1580


What is the crank length in the slab?

628


What is command line?

685






How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

1622


What are the ingredients of pre-stressed concrete?

775


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

1680


Define What are the reasons for geotechnical site investigations in Uganda?

686


What is the absolute pressure scale?

677


What are the techniques to measure road difference?

756


What is limit state method and working stress method and ultimate method

1134


difference between fc and fc'?

1308


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2021


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

1954