In site how we can identify one way slab and two way slab?
Answer Posted / binubal123
In two way slab reinforcement is in 2 layer @ T&B of equal dia is provided whereas in one way slab main reinf tats reinf of higher dia is provided along shorter span and nominal dia reing is provided along longer span
Is This Answer Correct ? | 23 Yes | 22 No |
Post New Answer View All Answers
What is the absolute pressure scale?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What is proportion of PCC Grade G?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
Aptitude, reasoning, quants, verbal and technical question
What is a kip?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What does civil engineering mean?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
what r the precaution for high in atp tempareture,low in atp tempareture