all engineering filed in which branch mother branch
Answer Posted / syed umar
CIVIL ENGINEERING
| Is This Answer Correct ? | 9 Yes | 6 No |
Post New Answer View All Answers
why we use aggregate,sand with cement in concrete?
How much is the cover for slab?
What is horizon or horizontal mining?
how to design and calculate materail quantity for concrete speedbreaker ?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Define What is a projection line?
how to calculate reinforcment in staircase cranked beam?
What is diversion tunnel in a dam?
Define a polyline?
how do you stabilize a waterlogged area in road construction
How will be cutting in timber plate size 600*400 column size
How do You Maintain a structure after getting cube test of low strength.
how calculate the bearing from two coordinates?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11