Why do not use fly ash bricks for waterproofing.
Answer Posted / d s shatish
The water absorption timing is very high and it allows the
water flow very easily.
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
What is meant by engineering drawing?
How do you determine specific gravity of cement?
can stub column take the load as main column
What are the alternate material for steel, Sand and aggregate
Formula of mid span bar
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
Why is concrete cube test carried out?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
How to calculate quantity of plum masonry in 1:3:7
how to stop beam concrete between column
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
How and where are aqueducts built?