Why do not use fly ash bricks for waterproofing.
Answer Posted / d s shatish
The water absorption timing is very high and it allows the
water flow very easily.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Why nautical mile is different from statute mile?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
What is the difference between absorption & adsorption and sorption?
List out the potential risk factors for workers on the construction site?
Calculation of Pier Cap with tapper area?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
what is parametre for M25 after 7 days strength
How to calculate Volume of Wet cement concrete for a specific grade?
Who name us Engineer & Why?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is difference between combin footing & rapt footing
Describe the sections included in a typical bill of quantities