Answer Posted / ramprasad.s
Hi
Anuja
Bug Life cycle
1. Open
2. Review
3. Assign
4. Fixed
5. Retest
6. Closed
7. Deferred.
sun_ramprasad@yahoo.com
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Have you prepared traceability matrix and how to prepare it?
can we do database testing in manual testing? then how we write the test case?
What is a test server?
what comments have u given in peer review? tell me at least 3 comments what u have given? july27 brahma412@yahoo.co.in
How will you determine when to stop testing?
Diffrernce between client server testing and web server testing.
If I want to check compability of software in a MAC OS then which steps shold I follow?
Scenario-based testing Option 1 concentrates on actor and software interaction Option 2 misses errors in specifications Option 3 misses errors in subsystem interactions Option 4 Both 1 abd 2
Why do you need to parameterize fields in your virtual user script?
Describe Testing Decomposition?
How will you prepare traceability matrix if there is no Business Doc and Functional Doc?
difference between change management and configuration management
A defect which could have been removed during the initial stage is removed in a later stage. How does this affect cost?
Hi, My name is Dinesh.I want to prepare for ISTQB certification , So can anyone please email me the syllabus of it and what is criteria for giving exam.Please email me answers at: dinesh0323@live.com
What are all the netwoking tools, hardware tools and software tools required for testing a web-based n client server applicatopn?