Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why after termination of HT cable armoured earth connected
one end, why not connect other end.pls tell me correct
answer.

Answer Posted / ma khira

Practically The earthing resistance of two pits at different location cannot be same hence if you will connect cable Armour at both the end, close loop will be created and leakage current will flow which is harmful to the device.

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if we give 60 hz single phase supply to the transformer used in europe , than what will happen

1932


Why can't we parallel the secondary circuits of two voltage transformers?

1491


please tell me, how i clear the objective test? when i studied form the one book after i solved the objective ,that time i solved that qes. but if i tried solve objective form the other book then i could not solved these que.

1666


how can we change the phase angle b/w two phase?

5161


How to calculate that clean water supply in one Day from 150 KLD STP?

2004


can anybody sent me power grid questions. what subject should i prefer for preparation?

2110


What is deference between MCB & MCCB & ISOLATOR

2108


What is the pro & con of having 11kv & 33kv incoming, and what is the adv & disadv. of converting from 11kv to 33kv.

2816


WHAT IS MEANT BY SHEATH VOLTAGE IN 132Kv cable?

2270


How may I enrol or get admission to your program?

1899


briefly explain the main blocks found in a microprocessor based system

2188


Incoming line 11kv And transformer capacity is 2500kva. Consumption load is 1300A. Then fuse capacity is 11kv line.

1668


how can we select the appropriate VCB ?

2306


How to connect the chemical earthing and complete process tell me plz

1855


Is it possible to connect a safety device in to parallel?

2138