Answer Posted / babu
Wt of bar per meter lengh should be tested in site.I.e
D*D/162.
| Is This Answer Correct ? | 7 Yes | 5 No |
Post New Answer View All Answers
how much shouid be the rate for ready mix concrete per cubic meter
How many cum of 9.5mm stone in 1 ton ?
In reclamation works what are the importance of geotextiles and sand?
What black man invented the clothes dryer?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Define Workability ?
How many types of slabs are there & how to design it?
how to find quantity of concrete in PCC M15
Define What happens to Load at yielding ?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
i want texture painting pwd data
What is the difference between built area and super built up area?
The concrete slump recommended for beams and slabs; is?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags