Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to test the quality of bars???

Answer Posted / babu

Wt of bar per meter lengh should be tested in site.I.e
D*D/162.

Is This Answer Correct ?    7 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much shouid be the rate for ready mix concrete per cubic meter

2010


How many cum of 9.5mm stone in 1 ton ?

2528


In reclamation works what are the importance of geotextiles and sand?

1130


What black man invented the clothes dryer?

1082


we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?

2330


Define Workability ?

1238


How many types of slabs are there & how to design it?

1277


how to find quantity of concrete in PCC M15

2124


Define What happens to Load at yielding ?

1792


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

2711


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

5080


i want texture painting pwd data

2064


What is the difference between built area and super built up area?

1224


The concrete slump recommended for beams and slabs; is?

1249


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2410