Answer Posted / babu
Wt of bar per meter lengh should be tested in site.I.e
D*D/162.
| Is This Answer Correct ? | 7 Yes | 5 No |
Post New Answer View All Answers
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
What is meant by dimensioning?
Define What is the difference between routing maintenance and major maintenance in school facilities?
density of crush sand & crush stone or grit powder
When was the first motorway built in england?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
What is thumb rule for deep trench excavation
What is meant by Crystal Concrete?
how to design and calculate materail quantity for concrete speedbreaker ?
how to calculate number of bitumen for road asphalt
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
What is semirigid connections?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
Where is the worlds longest elevator and how long is it?