Why went

Answer Posted / ripul gosh

Hi Varadharajan,
It can't be vice versa because vent hole is used for liquid flow in pipes. If any gas gets trap being lighter in density it will go towards upside of the orifice plate. For this reason vent hole is on the upper side.
Drain hole-which is located towards the lower side of the orifice plate used for gas flow in industrial pipes. It is obvious that any particle will higher in density than gas and will always try to be on the lower side of the pipe. So drain hole provision is made so that the trapped solid or liquid particle will easily go out of the orifice plate.
Both the holes are provided so that the trapped material can't cause any erroneous reading in the differential pressure measurement.

Is This Answer Correct ?    22 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826

2179


Punj lloyd is coming in our Jadavpur Universtiy campus for campus placement. Please send me some hints about the writtend exam. My email id is subratafriends@gmail.com

2949


Question on maha cement

814


Questions on flow meters,few questions on HART protocol,

2092


give me all the details about the interview and which type of question being asked

2302


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2263


please send data bank of quetions answers on analytical instrumentation.

1991


pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.

3230


sir, i preparing hpcl,ongc,barc,hal exams(instrumentation engg)pls send a placement papers

2397


plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}

2409


please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com

1751


hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.

2266


this site is owned by an nonsense

2407


Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .

2584


can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know

2198