Answer Posted / ershad ansari
Therefore dry volumen for 1 cubic yard = 1.6 cu yards = 43.2 cu ft.
One bag of cement containing 43.2 kg is 1 cubic feet.
Is This Answer Correct ? | 10 Yes | 15 No |
Post New Answer View All Answers
Describe the sections included in a typical bill of quantities
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
What applicable rate of wct in bihar
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
What are the applications of the modulus of elasticity?
What is the different type of slump test indications?
what is detail procedure of eccentric footing? plz. give solved exmple?
How do we calculate the power of centrifugal pump?
Explain what are the phases inspections are done by local authority while construction?
how much required strength of cement concrete bricks(size 230x115x75mm)
in the construction of residential building what type of tank are used?where?why & what is its purpose?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
types of survey and levelling instrument ?
I what know about life time of frp tank plz explain about it specifications & other details
Critical Path Method is...