Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what happend when 230v dc motor we supplied a 23v ac supply

Answer Posted / surendra

dc motor works on principal of f.left hand rule and force is given by f=BIL.B IS PROPORTIONAL TO voltage if supplied voltage is low machine may not get required force to rotate, hence it won't rotate

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why ss stablity limit is more transient stablity limit?

2171


What is I to C?

2127


what are the principles of a booster converter?

2051


with 3 phase board on a 63 amp rcd is it ok to have 6 electrical showers 2 on each phase and what problems could happen

1807


What is the main purpose of c.f.b.c.boiler

1688


1.what is meaning of curve into a mcb. 2.what is basic reason changing of curve

1979


how balanced in star delta connection ?

2068


11kV capacitor bank of rating 2.4KVAR, is charged with protective relays of only over current & Earth fault &.......without Over Voltage, Under Voltage & Neutral Displacement Relay. Is it advisable??

1586


What is the practical way to calculate the cable size for known ampere load?

1420


the site measured knee point voltage of protection class CTs should be greater than rated knee point voltage? what about meetering class CTs. Should it be below the rated knee point voltage?

2243


what is subtransient , transient and steady stateac components

2155


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2620


How to calculate the current of Highpressure Mercury Vapour Lamp?what is the basis?whether we have to consider power factor or not?

2134


how make megger test for control cable like 12c x 1.5mm and what it apply voltage and test timing details.

2182


what is the criteria for selection of conductor used for ehv ac electrical dischrge

2064