Answer Posted / madhava reddy n
Shuttering is a engineers technical term and centring is a
colloqueal name given by the shuttering carpenters. (like
prakruthi and vikruthi)
| Is This Answer Correct ? | 12 Yes | 19 No |
Post New Answer View All Answers
how to find out hard strata in bored pile when the DMC method adopted.
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
how is the reinforcement is distributed in triangular slab
How do you maintain water pressure?
crank types
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
What is meant by dimensioning?
why we are useing plastic under the lean concrete?and whts the advantage?
what is the difference between natural draught cooling tower and induced draught cooling tower
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
how to find ssm in foundation?
How can you produce desired alloys and discuss their applications in daily life.