Answer Posted / jayabal
1,Rcc
2,Pcc
3,CC
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What is the zero value in quantity surveying
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
how much cement and sand required for 1cum rr masonry
what is pile and deam foundation
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
Define What is rigging?
What Are The Steps Involved In The Concreting Process, Explain?
I need model question papers for writing the Dubai municipality exam,for G+1
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What is difference between combin footing & rapt footing
may i know the detailed description of cutting length
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post: