How much kv gas generator is needed to run 2 hp and 1 hp
airconditioners, plus a refrigerator and 4 Tvs
Answer Posted / k.prakashchandra
5 KVA
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
why high speed tripping relay will be used in tripping circuit why not normal relay
What is oscillator circuit?
hi....I am from india..i have completed my engineering in electrical and electronics field with 58.4% and my IELTS score is 5.5 bands....Recently i received my I-20 in computer and information science from Troy university in Alabama.On 18th i have a visa interview can u please tell me what type of questions i have to answer ??????
hi friends this is a newcomer in your community of enthusiastic peoples. i am preparing for SSC (CPWD JUNIOE ENGG EXAM FOR ELECTRICAL) pls guide me on the same how to crack it? PLS LET ME KNOW IS ANYONE THERE WHO PASED IT? CAN I GET THE QUESTION PAPERS OF PREVIOUS EXAMINATIONS?
Will any motor burn if voltage provided is lesser than the rated voltage???? If yes, then how is speed control possible with voltage control
In cable sizing calculation (determining the max route length of cable) why we choose the shortest length between cable length of full load current Iflc & starting current Istart?
What is the main purpose of c.f.b.c.boiler
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
what is the value of combined earthing in general electrical circiut?
what about GD square and its important for motor design?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
There is any especial requirement for motor to drive through with VFD?
what r the checklist while installing 500 kva transformer
if 12v battery get discharged for 2 months after if we put charge it will charge again?how much time it will take to charge?