Answer Posted / mohammad eqbal
The vertical form work is called shuttering,where as horizontal form work is called as centring.
| Is This Answer Correct ? | 40 Yes | 36 No |
Post New Answer View All Answers
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
Explain what is 1/8 on the architect ruler denotes?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
what is the mix design for M:60 with micro silica andmetakaoline?
What is structural frames or systems?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
Different sizes of Hollow blocks and its weight. Thanks.
What are the steps involved in the concreting process?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
Define What is Civil Engineering?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
How do you prepare Material Recovery Statement for deduction from contractors bills?
What is unit weight of normal concrete?