Answer Posted / mohammad eqbal
The vertical form work is called shuttering,where as horizontal form work is called as centring.
| Is This Answer Correct ? | 40 Yes | 36 No |
Post New Answer View All Answers
What tor stands for in tor steel?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
how to disign cuplock shuttering and it's matireal requirement snd any related web site
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
what is differences between ferrock and concrete ?
Draw the cross section of a boundary wall and label its part with detailing?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
What will you do if a portion of load bearing wall collapses under your supervision?
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
The foundations are placed below ground level, to increase?
What is soil enforcement?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
what is the price of a cubic meter of concrete on international market?