Answer Posted / chandu
There is no difference between centring and shuttering its
called shuttering for centring work.shuttering means
meterial and centring is a name of work.
| Is This Answer Correct ? | 6 Yes | 36 No |
Post New Answer View All Answers
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What black man invented the clothes dryer?
What is the meaning of a blue land surveyors flag?
What happens to Load at yielding ?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
What is Critical path in Ms-Project ?
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
what is a well
how to identify the failure of building by expansive soils
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
types of piles detail,