Answer Posted / biplab ghosh
shuttering means a shape made before pouring of concrete as
specific size and diamention. This shape is made by
plywood/plate and with proper support.
centring means supporting arrengment of roof slab from
bottom.
| Is This Answer Correct ? | 137 Yes | 23 No |
Post New Answer View All Answers
how many BSCs can i connect to the HUAWEI MSC
why do we not deduct volume of steel to find actual volume of concrete in practical???
How does siphoning work?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
Discuss some applications of modular elasticity?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
What black man invented the clothes dryer?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
Define What are the uses of alloys in daily life and how are alloys made?
How you can use different dimension tools in cad? What are the different dimensions available?
How to do rate analysis for concrete work including shuttering work?