How to convert n/mm2 in to kg/cm2?
Answer Posted / anupam tyagi
1 kg= 9.81N
1 cm = 10 mm
Therefore:
1N x kg
-----
9.81 N
-------------------
mm2 x 1cm
------
100 mm2
= 0.1019368 kg
--------------
1 cm2
-----
100
N/mm2 = 10.19368 Kg/cm2
| Is This Answer Correct ? | 27 Yes | 3 No |
Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
How did the romans get water up hills using aqua ducts?
What is the basic difference between OPC
who to find building iron rod strenth
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
What is the usage of zoom command?
Define Who designed the city of Washington DC?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What is the use of array command?