The calculation on how to calculate the water cement
ratio is just directly divide the total volume of water
against the volume of the cement (water cement ratio is
equal to the total volume of water over the total volume of
cement)
| Is This Answer Correct ? | 34 Yes | 6 No |
Post New Answer View All Answers
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
what is pile and deam foundation
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
How to cal. The weight of hollow pipe?
I am called for interview from north east power plant .so, I need some interview question which may help me.
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
cause of cylinder test failure
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
What is the force exerted by the tacoma narrows bridge?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
why do we provide haunches in rcc box or underpasses?
five requirements of infill panels for walls?
Define What is Civil Engineering?