why shear reinforcement is not provided in the design of
footing?
Answer Posted / robert
The design of a footing effective depth (d) is usually based
on the punshing shear criteria. Therefore, the hight (h) of a
footing satisfies punshing (2-way) shear and one-way shear. In
this case, shear reinforcement are not required.
Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
Why concrete barriers have curved surface profiles?
Explain the mechanism of cavitations in pipes and drains?
what is the dimensions of river sand truck trailer or trolly ?
What is construction mitigation management?
What are the advantages of cad software?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
What is GSB gradation
what is the max. area can we apply the plate load test ?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.