what affect on the structure and related beam of slab when
provide one way slab insteade of two way slab

Answer Posted / g.aravinda kumar

Reinforcement is tied for one way slab instead of two way
slab,the structure is fail due to distribution of load on
beam,beacuase distribution of load is different in one way
and two way.

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

2087


What is the per cu. mt. price of ready mix in Gujarat region.?

2429


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2493


can i get civil engineering test papers.......?????

2550


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2546


what is the difference between replacement of cement by groundnut shell ash

3308


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

2063


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1923


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2241


pls mail some more tecnical qustions at msaranya2610@gmail.com

2183


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1842


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

2558


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


I need to constructive work in amaraj batteries

1939


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2510