Answer Posted / nadarajan v
vcb means vaccum circuit breaker used in ehv power station.
A circuit breaker in which a pair of contacts is
hermetically sealed in a vacuum envelope; the contacts are
separated by using a bellows to move one of them; an arc is
produced by metallic vapor boiled from the electrodes, and
is extinguished when the vapor particles condense on solid
surfaces.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Give me the calculation steps to design an electromagnet to be work in 230V 50 Hz AC Supply. Also give force that is created by that electromagnet when it gets energized.
TCS IS IT COMPANY THEN WHY DO THEY NEED ELECTRICAL &ELECTRONICS ENGINEERS?
Operation of isolators.
hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible
use of PIR in ehv breaker
how to copy from plc ge fanuc versamax series,all input and output, adress, and printout.
In MEP Services what are parts of STP and what are there function?
WHaT IS THE CONCEPT OF INDUCTION LAMPS IN MODERN LIGHTINGS, and HOW IT WORKS TO EMIT LIGHT ( AS NO ELECTRODES ARE PRESENT ) ?" COULD INDUCTION LAMPS CAUSE INTERFERENCE WITH COMUNICATIONS INTO A STORE USING INDUCTION LIGHTING ? WHAT IS THE BENEFIT OF USING THE LOW FREQENCY INDUCTION LAMP , VERSUS LED , AND VERSUS FLUORESCENT, AND VERSUS ANOTHER KIND OF LIGHTING . THANK yOU MOISES GUINDI
please send me RRB electrical engineer previous year questions for Sr. Section Engineer
What is electrical grounding?
what are the tests comes under the type test, what tests comes under routine tests.
Explain in details how you would react to an unexpected incident when your supervisor or manager is not around to give instructions?
How to discuss the phase shift of transformer considering open delta?
Work done in a free expansion process is
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit