Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why is DC use instead of AC for protection and control
circuits?

Answer Posted / ss

there is chances of failure of ac suply but dc suply cant
fail because it is fed from batery bank.

Is This Answer Correct ?    10 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is LSR?

2143


Safety of on line ups

1904


What is meant by reactance voltage?

1081


what purose of the double circuit transmission line phase of the line phase changed for circuit-1 for Circuit-2 R-Y-B B-Y-R

2235


ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????

998


can we find the inductance of a induction motor?

1933


Can we indroduce the principle of single phase induction mator to Transformer? i.e. by Producing rotating flux in the transformer.

2260


What is meaning of out of phase (making & breaking) capacity And how to calculate

2170


prove that power consumed in 3 phase delta system is 3 times as compared to 3 phase star system

2191


What is meant by earthhing of a magnetic flow meter and when to use empty pipe detection?

2194


Who are the manufacturer for Nitrogen based Fire Protectio/explosion prevention for Oil Filled Transformers? India and international both?

1875


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1750


give some advantages and disadvantages of combiniing the session, presentation, and application layer in the osi model into one single application layer in the internet model

2662


How LT megger works ?

2089


what is high and low cut off voltage of BB and DG at SPS????????

1431