Answer Posted / naresh adepu
There are 4 level of Testing
Level-0----->Testing on intial Build
Level-1----->Testing on stable build
Level-2---->Testing on Modified Build
Level-3---->Testing on Final Build
| Is This Answer Correct ? | 15 Yes | 11 No |
Post New Answer View All Answers
Tell me example for Risk,Mitigation,Assumption?
What is the Testing strategy for testing client server applications/products?
any one giv test cases for wordpad using equivalence class partioning
What is a failure?
what is the cheklist to check SRS document (after releasing) as a test ingineer and how can we check
how many modules in ur bank project? what functionalities r there?how did u check? could u plz expalin ur banking project?
Define cause effect graphing?
online demo for bug tracker tool(let me know the website)
Why we have to do manual testing?
What is test plan and contents available in a test plan?
How do you know the code has met specifications?
Hi friends I am kranti completed my IT diploma in 2005 & after that complete my software testing course. Now I am working in small software form as software tester. I have 2 + year experience in manual testing. Now I wan to change company. Plz told me is there any effect that I can not have any degree although I have 2 + experience ?
Enlist some bug status along with its description?
What is the difference between code walkthrough and code review? What is the difference between walkthrough and inspection?
Diffrence b/w functional testing,functionality testing,system testing?