Answer Posted / santosh
1 cum = 35.52 cu ft
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Why was the empire state building made of steel?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
What is kn measurement?
Why are pull-out tests performed for soil nails?
How to find permissible diagonal tensile stress in reinforced brick work
How to arrive d*d/162 , for finding the kg per meter , wt of steel
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
What quantity of 1.0 m3 bricks required?
How long does it take concrete to harden?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
In earth work 1300 cum soil how to calculate how many liters require in water
how to remove the quantity of metal 1 and metal 2 in concrete
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.