Answer Posted / santosh singh
it is TEMPORARY BENCH MARK IN CONSTRUCTION. THIS IS REQUIRED
TO GIVE LEVELS TO BUILDING. IT CAN BE THE CENTRE O ROAD OR
GROUND LEVEL OF EXISTING BUILDIG ETC.
Is This Answer Correct ? | 68 Yes | 13 No |
Post New Answer View All Answers
How is improve my knowledge in construction industries....
how to find ssm in foundation?
what is the maximum number of course that can be laid according to IS code and the max height.
what is the Asfalt test?in road constraction..?
Why does the pressure increase under soil?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
What is the coeffiencent Friction Angle between Steel and Ashphalt?
sir please send me campus placement questions in civil engineering
to minimize budget cost of building , what can i do
How many pyramid in egypt?
what is the weight of 6000 psi concrete in lb/cft?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
How much material is required for constructing a 2 Lane 2Km rigid pavement road
How can you distinguish between sorption, absorption and adsorption?