Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate the stirrup bend length?is there any
formula?

Answer Posted / mufajjal ujjainwala

For 135 degree bend 10*dia of bar or 75mm min.

Is This Answer Correct ?    8 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the construction cost for per cft of multistorryed building in kolkata?

2246


Define line type?

1092


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

6061


what is the mix design for M:60 with micro silica andmetakaoline?

2246


what is c4x light weight cement blocks

5644


what is the type of earthing

2214


Which tests are performed on soil to decide the type of foundation to be provided.

2140


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

3109


what is work of planning deptt. in any construction compny (in road project)

2437


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

2003


Explain moment of inertia?

1089


Whats the meanig of ,'K' VALUE in the case of soil.....

1980


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

2240


what is the list of building construction equipment & teir output?

2069


What is construction mitigation management?

2306