Please note that the mix design and water cement ratio
depending upon various factors, such as type of cement,
aggregate, site conditions, etc.
The mix design provided here is for reference purpose only.
Actual site conditions vary and thus this should be adjusted
as per the location and other factors
Ratio's are like this,
Cement:Fine aggregate(Kg/m3):Coarse aggregate(kg/m3):Water
(l/m3):Plasticizer (l/m3)
1) M60: 1:1.35:2.19:0.29:0.8
2) M50: 1:1.472:3.043:0.35:0.012
3) M40: 1:1.65:2.92:0.4:0.006
4) M35: 1:1.76:3.18:0.4:0.005
5) M30: 1:1.87:3.38:0.42:0.005
6) M20: 1:2.4:4.93:0.5:nil
Thank you
Is This Answer Correct ? | 5 Yes | 18 No |
Post New Answer View All Answers
Describe the sections included in a typical bill of quantities
Can we apply curing compound on ceiling (slab Bottom)
a butt weld is specified by
What will you do if you encounter problems like accidents?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What are the ingredients of pre-stressed concrete?
What is fineness modulus ? and its sieve # ?
plz.show development and anchorage length in simple diagram.
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
The largest size of paper used in plotter to print the drawing made by Autocad .
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .