Answer Posted / rakesh kumar
Now it must be noted that in a generator the prime mover
torque is applied against the direction of electromagnetic
torque . the field system prodeuces the field flux and 90
lagging to it is produced the armature flux . the resultant
air gap flux somewhere between the two , all the three
fluxes revolving in the same counterclockwise direction and
hence the required electromagnetic torque is set up in the
counterclockwise direction and hence the primemover torque
is applied in the clockwise direction .
Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
How can we connect additional batteries to three phase ups? What are parameters we have to check when connecting?
Is it good to short Neutral and Ground in the PLC or DCS main Power supply. Pls give YES or NO with reasons...? Simarpreet
Please brief me about number of pole in alternator.In single phase alternator coils are connected in star or series. How to calculate frequency for the same.
Mention the disadvantages of low power factor?
why we use condenser in the thermal power plant, althrough the same vapour will be again heated
What is the difference between acs 550 & acs 850
What is UPS and How do you maintain the UPS Maintenance? Brief Description on UPS maintenance.
How Self works in DG set
critically criticize the application of ring main unit in power system
How would you relate your key competencies to this position?
we have consol make 3 phase servo stabilizer for cnc m/c. while installing the earth neutral voltage is 1.7 volts at stbilizer off condition and when stabilizer get on en voltage reaches 4.8 volts (new earthing is done and neutral is helthy condition all phase to neutral volts 440,442,441 v)why this happen.solution for cause.
a 230v transformer with step down ratio 19:1.it has 2000turns on primary and rated 25va calculate max primary current no of secondary turns volts/turn
How to distinguish whether MCB is DC or AC looking at it physically
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.