Answer Posted / dd
that means that the system has reactive power exceeded, the
reactive power in tx.lines undesirable which opposes the
real power.
so SEB's put a penalty
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is core CT & it's function?
What is the Minimum winding resistance of motors ( small & big)? referance range
how make megger test for control cable like 12c x 1.5mm and what it apply voltage and test timing details.
What are the material used for resistor?
how we calculate the dick for a pole?
Explain the method to keep noises low in a control system?
what is the maximim current drawn by 1 phase and three phase welding machine
3- What is the target from Zero Impedance, Single Phase Imp., S/C Imp. and magnetic balance tests?
i want to know how to determine that a surge arrester work properly in 11kv system. and how to test a 12kv surge arrester
how to know the diffrential relay setting of 06mva step- down (delta-star)transformer?
how to find Harmonics and types as per the equipemnts
Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.
Explain how you intend to work under pressure to meet up with deadline target?
Can we convert off line transformer to on line transformer
what is the diference between the 4pole & 6pole DC Motors & what is advantage 6pole over the 4pole ?