Qatar fertilizer call me for interview as Instrumentation
Project Engineer. Please let me know what kind of question
they asked ? ALso they said they will take Written test,
any idea about this written test ?
Answer Posted / rajkumar.diice
Written test be usual
questions will be pressure
conversions, temperature
sensors, massflow nevering
technique, control valve over
hauling etc. In interview They
ask questions about P&I
diagrams and their symbol
expansions. You should know
to develop a diagram. More
often they question about
differential pressure
measurements in orifice
plates. And about
thermocouples! Pipeline
standards! DCS architecture
Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
what is a good line as ic engineer as maintenance ,oc, project, calibration ,validation engineer?
How to work temperature gauge?
hello can yoy pls send me previous papers of jindalpower and steel ltd.....'m from instrumentation..... mani1048@gmail.com
how radio frequency level probes works with its controller ? what is its principle ? pls give me brief explanation?
Capacitance, resistance ( colour coding ), parallel & series circuits.
How to decrease opening & closing time of on/off valve?
how do we commission inergen system?
How ejector(or)evactor air pump is working in thermal power plant?
what is Best Among SINK Or SOURCE Type Design In Digital Signal, Either Iput Or Output? WHY?Can any one..
If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?
Is it ok, to use non-contact type Radar type LT, on a tank that is half circular from the bottom side? If yes the, isn't the waves gonna bent in other directions?
is there any digitel grevity meter availaible in the market by which we can measure specific gravity of a battery?
how to calibrate steam control valve in steam turbine
what is difference between HOT permit and cold permit
how to calibrate load cell