Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why does the time taken for fuse to melt is longer as the
wire length increases?

Answer Posted / k.prakashchandra

The opposite is true as the resistance of the wire increases
with length.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please send 110 kv sb station full single line drawing(sld)

2479


how to identify the cable quality and what is flame proof cable

2122


I need the recommended size for a 3 phase transformer at 13.8 KV Primary and connected loads of 3000 kVA at 4200 volts and 2375 kVA @ 480 volts AC.

2038


how many current required for hypo test

1980


PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com

5455


WHY SEPARATELY EXCITED MACHINE NEEDS EXCITATION BY DC SUPPLY WHY NOT BY AC

1904


how to decide choke rating for drive?

2330


When steam condenses and becomes water at the same temperature, the specific heat for the process in kJ/kg k is

1146


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2038


I need a formula to calculate the size of cable as per load but in the terms of length. Please Reply me as i search lot of sites but i did not get the answer.

2087


what is is the potential diffrence between two phase ?

6452


how ct burden,magnetising current,ratio and knee point voltage are related & derived

2212


What is the working principle of MIG welding? and its out put Voltage?

3326


why we used dc supply for field in dg set

2400


design a LV scheme for a 15 storied building?

1960