why the undervoltage relay's interlock is used in
earthswitch closing operation of the 400kV line scheme?
Answer Posted / k.prakashchandra
So that the earth switch can not be closed with supply
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what are the basic insulation levels & what its Unit
Why MCCB is Getting tripped sometimes when there is no load in the Midnight ?
For group 1 , 2 whather i have to prepare my technical or general studies etc? and im graduate in ee engg. for wht posts im eligible for? please tell me!
Define Electrical Insulation and examples of Solid,Liquid and Gaseous insulating materials?
In EDO ACBs what is a purpose of closing coil and motor, what is the operation of these devices are they inetconnected. means if we give supply to motor and by BCS we charge Closing coil,what exact is operation is and how it charge a spring of ACB. Sir if anybody has an wiring diagram please send me the link to operate and EDO breaker.
how can i determine the gear ratio for a rack and pinion system if an electronic gate operated by an electric motor is to travel a distance of 5meters in 15 seconds.
hai friends i have BSNL JTO exam on next month so if any body have model question paper or give preparation tips to my mail id kumar4486@yahoo.co.in this will helpfull for my future .plz & thank u by kumar
what are the problems that generally occur in power flows??
kVA rating of ordinary transformer is increased when connected as an auto transformer because A transformation ratio increased B secondary voltage increased C energy is transferred both inductively and conductively D secondary current increased
3- What is the target from Zero Impedance, Single Phase Imp., S/C Imp. and magnetic balance tests?
What are the application of filter?
i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.
How can we findout the maximum efficiancy of Transformer? At which load?
What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?
Give details on how you intend to handle a challenging position you are posted to manage unexpectedly as a company staff?