what is the least-count of plane-
table,dumpy,theodolite,compass,tachometer?
Answer Posted / akash verma illiterate enginee
dumpy levey: least count 5mm as it is based on staff
reading thats why least count is 5mm.
theodolite: least count is 20"
compass: least count is 30'
| Is This Answer Correct ? | 751 Yes | 62 No |
Post New Answer View All Answers
difference between trapezoidal and pedestal footing and how the load acts on that
What is the name of this multiplication factors ?
What is limit state method and working stress method and ultimate method
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is binding spacing of the rebars at lapping zones.
How much quantity of rod binding work by a rod binder per day
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
Why should appointment store person for project ? what is the benefits for company ?
What is a kip?
Explain moment of inertia?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
What do you mean by honeycomb in concrete?