Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

some times voltage does not built in small generators why ?

Answer Posted / kapil

due to absence of residaul magnetism in it

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

please I wont know how to calculate the vector group for power transformer ZNyn11 best regard.

1920


What can you contribute to the progress of our Company as an employee if you are selected?

5472


How much current will a 5 HP delta connected motor at no load will take?Is tat need a starter

7861


i need project topics along with circuit diagram in the electrical and electronics engg and also some websites regarding projets.

2130


Please send 110 kv sb station full single line drawing(sld)

2522


How to calculate or formula to calculate rhe power in 2 phase system ??

1551


state working of halogen lamp?

1883


What do you mean by the zone of protection?

1148


In vapour absorption refrigeration machine fluids used are

1303


what is sevice settings for mccb?How can be it setted?

2070


How will A Medium voltage circuit breaker(11 kV voltage level) operate under short circuit fault condition whether It is having short circuit release like Low voltage circuit breaker or relay should be given?

1996


if negative of DC supply used and positive is grounded through EGB, and if ELCB used in the system then is it sense the positive volatge and get tripped is it possible?

1953


Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078

1871


which are the criterias needed to select the kind of neutral earthing(solid earthing,resistance earthing,etc.) at various voltage levels in electrical distribution?

2034


what are your career plans upon completion of the programme and the relevance of recity generation to your professional development?

2265