By just seeing a transmission tower, how can we knew the
voltage it carries..?[110kv, 220kv, 400kv...]???
Answer Posted / ankamsreekar
by counting the no of insulators in the string insulator.
| Is This Answer Correct ? | 23 Yes | 0 No |
Post New Answer View All Answers
what is the use of the circle diagram
how to find out cable size if load is 2800 watts, 230 volts AC supply and load distance is 1800 meters
Is there possible to Test Transformer for Overfluxing Capability. Or is there any firm who does Overfluxing Test on Transformer?
What is the formula for selecting the cabels according to load? How to calculate what sq.mm cabel to be used?
A system absorbs 100 k J of heat and the increase in its internal energy is 100 kJ; the work done is
As per the Anchor capstan motor specification, full load current is 200A. starting current is 1750 A and acceleration time is less than 8 seconds. Please guide for selection of cable size.
pls tel me the electric train traction motors name plate details like rpm,torue,voltage,amps,watts..ect..
If we have to feed a housing complex having load 8MVA, than what would be the better option, either we first step down 33kv supply into 11kv & than 430v or we proposed no of 33/.44 kv transformer, also which option is economical?
Logic using 1 kV or 1,1 kV grade in house wiring Low voltage cable. Explain/suggest? some use 1kV and some prefer 1.1kV grade insulation low voltage cable why??
how can I calculate charging current of cable/overhead conductor? what is roll of voltage in it ?
a battery is having capacity 100AH and 25% charging .if a load taking 10A & connected 6 hour .what is the final condition of the battery.
what is the prinsiple of dc motor and construction and working ,application of dc motor.
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
completed BE & done apprentice at tneb & having experience 6 years. want to get c license. will apprentiship & BE be helpful for getting c license. will i get any preference by showing this?
sir iam a 3rd yr eee student.no core company comes for recruitment to our college.my aim is to be placed in l and t.tell me the procedures.