Answer Posted / chris
· SEI = ‘Software Engineering Institute’ at Carnegie-Mellon University; initiated by the U.S. Defense Department to help improve software development processes.
· CMM = ‘Capability Maturity Model’, developed by the SEI. It’s a model of 5 levels of organizational ‘maturity’ that determine effectiveness in delivering quality software. It is geared to large organizations such as large U.S. Defense Department contractors. However, many of the QA processes involved are appropriate to any organization, and if reasonably applied can be helpful. Organizations can receive CMM ratings by undergoing assessments by qualified auditors.
Level 1 - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Few if any processes in place; successes may not be repeatable.
Level 2 – software project tracking, requirements management, realistic planning, and configuration management processes are in place; successful practices can be repeated.
Level 3 – standard software development and maintenance processes are integrated throughout an organization; a Software Engineering Process Group is in place to oversee software processes, and training programs are used to ensure understanding and compliance.
Level 4 – metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.
Level 5 – the focus is on continuous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.
· ISO = ‘International Organization for Standards’ – The ISO 9001, 9002, and 9003 standards concern quality systems that are assessed by outside auditors, and they apply to many kinds of production and manufacturing organizations, not just software. The most comprehensive is 9001, and this is the one most often used by software development organizations. It covers documentation, design, development, production, testing, installation, servicing, and other processes. ISO 9000-3 (not the same as 9003) is a guideline for applying ISO 9001 to software development organizations. The U.S. version of the ISO 9000 series standards is exactly the same as the international version, and is called the ANSI/ASQ Q9000 series. The U.S. version can be purchased directly from the ASQ (American Society for Quality) or the ANSI organizations. To be ISO 9001 certified, a third-party auditor assesses an organization, and certification is typically good for about 3 years, after which a complete reassessment is required. Note that ISO 9000 certification does not necessarily indicate quality products – it indicates only that documented processes are followed.
· IEEE = ‘Institute of Electrical and Electronics Engineers’ – among other things, creates standards such as ‘IEEE Standard for Software Test Documentation’ (IEEE/ANSI Standard 829), ‘IEEE Standard of Software Unit Testing (IEEE/ANSI Standard 1008), ‘IEEE Standard for Software Quality Assurance Plans’ (IEEE/ANSI Standard 730), and others.
· ANSI = ‘American National Standards Institute’, the primary industrial standards body in the U.S.; publishes some software-related standards in conjunction with the IEEE and ASQ (American Society for Quality).
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
In a systen design to work out the tax to be paid: An employee has Rs 4000 of salary tax free. the next Rs 1500 is taxed at 10% , the next Rs 28000 is taxed at 22% , any further amount is taxed at 40% , the nearest whole Rs, which of these is a valid boundary value analysis test case ???? a)Rs 1500 b)Rs 32001 c)Rs 33501 d) Rs 28000.
Test Cases For Router&Switch
which test strategy your are fallowing in your company?which documents u r using in software development life cycle?
What is the main use of preparing a traceability matrix?
What are the challenges you faced in your project (Testing) and in your company?
How to derive test data from the design documents?
What is mutation testing & when can it be done?
What does a manual tester need to become proficient with db testing?
What knowledge I must have as a 3 yrs. manual tester??
What is a top-down and bottom-up approach in testing?
What is mean by Schedule report who is the responsible for generated that one ?
Can Anbody please send me Daily Work status format in which I can save my daily work activity
what is date field test case
Can you explain tailoring?
What is localization testing (l10n testing)?